Stone Open 50 Latest |
| Friday, 02 May 2003 |
Prior to commencing the final painting process all the winches and deck hardware have been pre fitted to ensure everything fits correctly. The will ensure that once the hull and decks are painted it will simply be a matter of bolting the hardware in place.
After the deck and coachroof where painted to a final undercoat the hull was then rolled over to allow the underside areas to be faired, and details such as the keel root fairing for the canting keel to finalised. |
Email this page to a friend  |
|